Send Message
Home
Products
VR Show
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Luoyang Zhongtai Industrial Co., Ltd.
Home ProductsCement Plant Equipments

12000 TPD Max 5 R / Min Cement Plant Equipments cement rotary kiln

China Luoyang Zhongtai Industrial Co., Ltd. certification
China Luoyang Zhongtai Industrial Co., Ltd. certification
Thanks for your kindly hospitality. Your company is very professional , we will have nice cooperation in the near future.

—— James

Good company with nice service and high quality and high reputation. One of our reliable supplier , goods are delivered in time and nice package.

—— Sammel

Through very good communication all problems solved, satisfied with my purchase.

—— Alexandra

Recommedation is good. Reception is professional. Demo training is also very great. Wish more online training after getting the machine.

—— George

Thanks for your good after-sale service. Excellent training and technology support helps me a lot.

—— Abby

I'm Online Chat Now

12000 TPD Max 5 R / Min Cement Plant Equipments cement rotary kiln

12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln
12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln 12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln

Large Image :  12000 TPD Max 5 R / Min Cement Plant Equipments cement rotary kiln

Product Details:
Place of Origin: Henan, China
Brand Name: CITIC LK
Certification: ISO/CE
Payment & Shipping Terms:
Minimum Order Quantity: 1 Sets
Price: negotiable
Packaging Details: Standard packing or according to customer's requirement
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 150 Set/Sets per Year
Detailed Product Description
Warranty: 1 YEAR Applicable Industries: Manufacturing Plant, Construction Works , Energy & Mining
After Warranty Service: Video Technical Support, Online Support Local Service Location: Viet Nam, Indonesia, Australia, Argentina
Showroom Location: None Condition: New
Voltage: Cement & Lime Plant Solutions Power(W): Cement & Lime Plant Solutions
Dimension(L*W*H): Cement & Lime Plant Solutions Weight: Cement & Lime Plant Solutions
After-sales Service Provided: Online Support, Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Video Technical Support Key Selling Points: Energy Saving
Cement & Lime Plant Solutions: Cement Plant & Lime Plant Cement Plant: 180-12000 Tpd Cement Plant
Lime Plant: 70-3000 Tpd Lime Plant Port: QingDao,ShangHai,TianJian
High Light:

12000 TPD Cement Plant Equipments

,

Lime Cement Grinding Plant

Products Description

1,000,000Tons/Year Cement Grinding Plant:

1,000,000Tons/Year Cement Grinding Plant:
In this 1,000,000t/y cement grinding plant, clinker and slag are ground separately. PFG120-50 rolling machine and Φ3.2m×13m cement mill are used in clinker ginding. Φ3.2m×13m ginding machine and high-efficiency powder separator are used in slag grinding.
This plant features are high quality, high productivity and low consumption.
 
Cement Rotary Kiln Specification Wet and Dry Cement Rotary Kiln
Product specifications(m) Kiln dimensions Capacity(t/d) Rotation speed(r/min) Motor power(kw) Total weight(t)
Diameter(m) Length(m) Obliquity(%)
Φ2.5×40 2.5 40 3.5 180 0.44-2.44 55 149.61
Φ2.5×50 2.5 50 3 200 0.62-1.86 55 187.37
Φ2.5×54 2.5 54 3.5 204 0.48-1.45 55 196.29
Φ2.7×42 2.7 42 3.5 320 0.10-1.52 55 198.5
Φ2.8×44 2.8 44 3.5 400 0.437-2.18 55 201.58
Φ3.0×45 3 45 3.5 500 0.5-2.47 75 210.94
Φ3.0×48 3 48 3.5 700 0.6-3.48 100 237
Φ3.0×60 3 60 3.5 800 0.3-2 100 310
Φ3.2×50 3.2 50 4 1000 0.6-3 125 278
Φ3.3×52 3.3 52 3.5 1300 0.266-2.66 125 283
Φ3.5×54 3.5 54 3.5 1500 0.55-3.4 220 363
Φ3.6×70 3.6 70 3.5 1800 0.25-1.25 125 419
Φ4.0×56 4 56 4 2300 0.41-4.07 315 456
Φ4.0×60 4 60 3.5 2500 0.396-3.96 315 510
Φ4.2×60 4.2 60 4 2750 0.4-3.98 375 633
Φ4.3×60 4.3 60 3.5 3200 0.396-3.96 375 583
Φ4.5×66 4.5 66 3.5 4000 0.41-4.1 560 710.4
Φ4.7×74 4.7 74 4 4500 0.35-4 630 849
Φ4.8×74 4.8 74 4 5000 0.396-3.96 630 899
Φ5.0×74 5 74 4 6000 0.35-4 710 944
Φ5.6×87 5.6 87 4 8000 Max4.23 800 1265
Φ6.0×95 6 95 4 10000 Max5 950×2 1659
 
Process Flow Design of 1,000,000Tons/Year Cement Grinding Plant:
1. Designing of Clinker Grinding Production Line
After gypsum, clinker and limestone are measured by the belt weigher, they will be mixed together in accordance with particular
proportions, and then sent to the stable weighing warehouse. During this process, magnetic metals are removed by the iron remover
from these materials. Then mixed materials will be sent into the rolling machine to be crushed. After crushed, they will be sent
to the powder separator, in which coarse powder will be sent back to the griding mill while the fine one will be sent to the
elevator for finished products. Finally, they will be sent to finished product storage. Meanwhile, dusty gas from the grinding
mill will be purified by the environmental protection equipment before discharged into the atmosphere.

2. Design of Slag Grinding Production Line
Gypsum, dry slag and pulverized coal are measured by the belt weigher before mixed together according to particular proportions.
Mixed materials will be sent to the mill for grinding, and during this process, iron remover is employed to remove magnetic metals
in these materials. After grinded, fine powder will be sent to high-efficeint powder separator, while coarse powder will be sent
back to the grinding mill. Finished cement will be collected by the air tank pulse bag filter, while the fine powder will be sent
to the storage for finished products through an elevator. Dusty gases from the mill will be used as the first gas to enter into
the powder concentrator, which is followed by fresh air. Finally, dusty gas will be purified by the air tank pulse bag filter
before discharged into the atmosphere.

3. Design of Mixing Fine Slag and Powder Clinker
Besides the fineness of powder clinker and fine slag in the grinding production line, accurate measuring and even mixing also need
to be paid much attention to. That's why we choose to use the screw measurer as the measuring device and the air slide as mixing
device as well as conveying device.
12000 TPD  Max 5 R / Min Cement Plant Equipments cement rotary kiln 0
FAQ
Q: Why we believe in luoyang zhongtai industries co., ltd: A: 1. More than 30 years experience. 2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts. 3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates. Q:Delivery time A: parts lead time 1-2months, machines 2-3months. Q:Payment terms A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit when signed contract. Full payment paid before shipping Q: Quality warranty? A: guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply. Q: After sales service? A: we can supply technical guide for machines running test and parts maintenance if end user needs.

Contact Details
Luoyang Zhongtai Industrial Co., Ltd.

Contact Person: Mr. David

Tel: 86-18637916126

Send your inquiry directly to us (0 / 3000)