Product Details:
Payment & Shipping Terms:
|
Name: | Coal Raymond Mill | Condition: | New |
---|---|---|---|
Type: | Raymond Mill | Motor Type: | AC Motor |
Capacity(t/h): | 0.5-120 Tph | Weight: | 34t~60T |
Warranty: | 12 Month | After-sales Service Provided: | Engineers Available To Service Machinery Overseas, Video Technical Support, Online Support |
Application: | Ore | Color: | Customerized For Coal Raymond Mill |
The Machines Classification: | Granding Mill Machine | Installation: | Engineer's Guide |
Spare Parts Supplying: | Lifelong Provide | Model: | 3R 4R 5R 6R 7R (Rollers) |
Feeding Size: | <30mm | Port: | QingDao,TianJin,ShangHai |
High Light: | 1.6TPH Raymond Vertical Mill,3 Roller Raymond Vertical Mill,1.6TPH Raymond Roller Mill |
New type lowest cost coal raymond mill for mineral grinding |
The Raymond mill is used for grinding more than 280 kinds of materials whose Mohs hardness is less than 9.3 such as barite, limestone, kaolin and slags, etc in the mining, metallurgical industry, chemical engineering and building material for high fine powder generation and processing. The product size is adjustable in the range of 80-325 mesh.
Structural Advantages of Coal Raymond Mill
1. Driving system of main frame adopts airtight gearing and pulley to guarantee the smooth drive and reliable operation.
2. The whole plant is a vertical structure of strong systematic characteristic, so it occupies small area. The crushing of raw material, grinding and packing is an independent production system.
3. The electric control system is controlled centralizedly, so the automaticity is high, the people is not needed in the operating room.
4. Main parts of the whole plant are made of cast and steel of high quality. The subtle technics ensures the durability of whole plant.
5. Compared with other milling plants, its passing ratio achieves 99%, which is what other mill can not reach.
Working Principle of Coal Raymond Mill
Load the stuff for grinding evenly and continuously into the grinding chamber of the main frame. Due to the centrifugal force in rotation, the roller swings outward and presses closely upon the ring. The shovel carries the stuff to the space between the roller and ring. When the roller rolls, the stuff is thus ground.
After being ground, the stuff is to be routed to the sorter along the wind belt of the blower and the rough powder will be put back to the grinder for regrinding. The fine powder flows into the product cyclone collector together with airflow and is expelled from the powder output pipe as product.
In the grinding chamber, since the stuff may contain moisture to some extent, the heat generated during grinding makes the moisture evaporate. since the pipeline joints are not airtight, the external air is sucked in and the circulation air mass increases. In order to enable the grinder to work under negative pressures, the increased airflow is guided to the duster anew sequentially to the atmosphere after purification.
Aftersales service
LUOYANG ZHONGTAI INDUSTRIES able to provide:
1. ENGINEERED SPARES - DESIGN AND MANUFACTURING
2. LARGE VOLUME STEEL AND IRON CASTING FOUNDARIES
3. HUGE MACHINE SHOP CAPABILITIES
4. TRAINING PROGRAMMES
5. PREVENTATIVE MAINTENANCE PROGRAMS
6. PREVETATIVE MAINTENANCE SERVICES
7. COMPREHENSIVE MAINTENANCE PROGRAMS
LUOYANG ZHONGTAI INDUSTRIES’s Field Service Engineers are trained specifically in the LUOYANG ZHONGTAI INDUSTRIES brand group products but are capable of undertaking the servicing of other OEM brands.
Our technicians are equipped with the most advanced technological diagnostic equipment available to trouble shoot your equipment to optimise performance and minimise down time.
LUOYANG ZHONGTAI INDUSTRIES also has an extensive capability in supplying all you consumable and electrical/ mechanical spare part needs.
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time:
A: parts lead time 1-2months, machines 2-3months.
Q:Payment terms:
A: Accept payment type: T/T, L/C, Western union,Cash.
30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: we can supply technical guide for machines running test and parts maintenance if end user needs.
Contact Person: Mr. David
Tel: 86-18637916126