Send Message
Home
Products
VR Show
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Luoyang Zhongtai Industrial Co., Ltd.
Home ProductsMetallurgy Machine

Vertical Pit-Type Quenching / Heat Treatment Tempering Furnace

China Luoyang Zhongtai Industrial Co., Ltd. certification
China Luoyang Zhongtai Industrial Co., Ltd. certification
Thanks for your kindly hospitality. Your company is very professional , we will have nice cooperation in the near future.

—— James

Good company with nice service and high quality and high reputation. One of our reliable supplier , goods are delivered in time and nice package.

—— Sammel

Through very good communication all problems solved, satisfied with my purchase.

—— Alexandra

Recommedation is good. Reception is professional. Demo training is also very great. Wish more online training after getting the machine.

—— George

Thanks for your good after-sale service. Excellent training and technology support helps me a lot.

—— Abby

I'm Online Chat Now

Vertical Pit-Type Quenching / Heat Treatment Tempering Furnace

Vertical Pit-Type Quenching / Heat Treatment Tempering Furnace
Vertical Pit-Type Quenching / Heat Treatment Tempering Furnace
video play

Large Image :  Vertical Pit-Type Quenching / Heat Treatment Tempering Furnace

Product Details:
Place of Origin: Henan, China
Brand Name: ztic
Certification: ISO9001:2008 CE SGS
Model Number: 100-600℃
Payment & Shipping Terms:
Minimum Order Quantity: >=1 Sets
Price: $7,000.00
Packaging Details: Standard packing or according to customer's requirement
Supply Ability: 500 Set/Sets per Year
Detailed Product Description
Condition: New Usage: Heat Treatment Furnace
Type: Tempering Furnace Dimension(L*W*H): Depands
Weight (T): 3 T Power (kW): 20-50
Warranty: 1 YEAR After-sales Service Provided: Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Video Technical Support, Online Support
After Warranty Service: Video Technical Support, Online Support Key Selling Points: Long Service Life
Local Service Location: Viet Nam, Indonesia, Australia, Argentina Applicable Industries: Manufacturing Plant, Energy & Mining
Showroom Location: None Rated Capacity: 0.15-20T
Rated Power: 10-50 Rated Frequency: 250-1200Hz
Capacity Of Transformer: 160-2*6300kva Secondary Voltage: 3*380V. 6*660V. 6*800V. 6*950V. 6*1250V. 2*6*1250V
Rectifier Pulse: 3phase And 6pulse. 6phase And 12pulse. 12phase And 24pulse Inductor Voltage: 750-3600V
Power Consumption: 350-750KWh/T Melting Rate: 0.18-20T/h
Weight: Depands Port: Qingdao. Shanghai
Time: 2-22hours
High Light:

380V Heat Treatment Furnace

,

ISO9001 Pit Type Tempering Furnace

,

130kg/furnace Quenching Tempering Furnace

Manual of electric quenching Furnace

 

(From left to right on the picture)

1. Electrical appliances

2. Warning elimination

  • I-Zone heating
  • Furnace operation knob
  • Furnace mouth upwards
  • Furnace mouth downwards

 

(From left to right on the picture)

1. Electrical appliances

  • Heat preservation timekeeping
  • I-Zone heating
  • Furnace operation knob
  • Furnace mouth upwards
  • Furnace mouth downwards

 

Brief Introduction about how to dry off the furnace

 

At the first time to use the furnace, need to dry off the furnace firstly.

 

1. 0-200℃ 12 hours

2. 200℃-400℃ 8 hours

3. 400℃-650℃ 6 hours

4. 650℃-850℃ 3 hours

5. 850℃-900℃ 2 hours

 

Note:Standard dryoff the furnace according above time range can extend equipment lifespan .

 

 

Introduction of electric quenching Furnace

1. Check the equipment operation and electrical appliances, infusion solution before charging.

2. Turn on the tilt switch after confirm that the device is normal ,the furnace body is upwards 45°(keep the furnace mouth upwards)

3. After the angle adjustment of the furnace body, make the workpieces(screws) are filled, move the equipment shaft to a flat position and close the furnace door , then open the ignitron tube valve of the furnace door.

4. Confirm the furnace door is in place and sealed,manually adjust the temperature control instrument(workpieces need to be heated ),then turn on the heating switch to heat ,and then turn on the rotary switch start to work ,then furnace start to rotate and heat .

 

5. When heating temperature of the I-zone shows 450℃-500℃, can infuse protection medium(industrial alcohol or other infusion solutions), rotate the infusion flowmeter knob to the corresponding place, during 5-10 minutes after infusion , if no flames are seen from the ignition tube of front furnace door ,should be manually lit the ignition tube with a match or lighter. After the flame came out, it’s normal from the ignition tube.Customer can manually adjust the infusion solution flow .

6. When heating temperature of the I-zone shows 780℃-800℃, can infuse carburizing medium(kerosene or other carburizing solutions). Then rotate the kerosene infusion flowmeter to the needed flow of the furnace.Customer can manually adjust the infusion solution flow .

7. It is time to discharging when the workpieces in the furnace are heated and the heat preservation meets its requirements. Turn off the protective atmosphere medium and carburizing medium, no flames are seen from the ignition tube of front furnace door, turn off the knob , open the furnace door.

 

8. Turn on the tilt switch, tilt down 90°,the workpieces are directly poured into the oil pool for oil quenching.(Note: After tilt down , also can press the furnace operation knob to make the workpieces poured into the oil poor quickly. Depends on the actual working area to operate.The workpieces must be poured into the material box in the oil pool, so as to make the next queching easily. )

9. After the workpieces in the furnace are fully poured, make the furnace body upward 45°, refill the workpieces.

10. After the workpieces in the oil pool reach the oil quenching time (about 10 mins or make the workpieces out according to the corresponding working flow requirement ), put in the tempering furnace to temper .

11. If the workpieces only need quenching, do not need carburizing operation, other processes keep the same, only do not use carburizing medium is ok . The carburizing temperature need to keep in 900-930℃. Quenching temperature 830-880℃. Normally, the carburizing heat preservation time is 3-5hrs, quenching 2-3hrs.

Technical parameter:

Model No. RGR45-9
Rated power 45KW
Rated voltage 380V/3phases
Rated temperature 950°C (controlled)
Instrument temperature control accuracy ±1℃
Temperature control partition 1
control mode Pid automatic mobilization, solid state relay
heating element Helical resistance wire ocr21A16Nb
Furnace pipe material 10mm 310S stainless steel(2520)
Heating element connection Y
Furnace tank size Φ520×680mm
Heating area 1
Discharging way axial discharge
Cooling mode natural cooling
furnace tank material 310S heat-resistant stainless steel
Overall dimensions(L*W*H) φ1850*2000
Capacity 120~130kg/furnace
Weight of the furnace 2.5ton
 

 

Contact Details
Luoyang Zhongtai Industrial Co., Ltd.

Contact Person: Mr. David

Tel: 86-18637916126

Send your inquiry directly to us (0 / 3000)