Product Details:
Payment & Shipping Terms:
|
Product Name: | Hydrocyclone | Type: | Ore Dressing Equipment |
---|---|---|---|
Feature: | Low Cost | Application: | Ore Processing |
Maximum Feeding Granularity (mm): | 0.1~16 | Inner Diameter (mm): | 10-660 |
Unit Weight Kg: | 0.8~950 | Port: | Qingdao |
Highlight: | Expenditure Hydrocyclone,Convenient Maintenance Hydrocyclone,Pulp Classification Hydrocyclone |
Pulp Classification Low-Cost Expenditure Convenient Maintenance Hydrocyclone
Brief Introduction
1. Hydrocyclone is a kind of equipment used for grading the ore pulp by using centrifugal force. Lacking of motion and power unit, it needs to match with relevant slime pump. It is mainly used in ore dressing industries for grading, separating, concentrating and desliming.
2. Hydrocyclone shows the features such as low equipment cost, easy assembling and disassembling, convenient maintenance, less area covers and low cost of construction. In addition, there are some other advantages like large capacity of unit volume, treatment, fine separation size, high grading efficiency, the time and quantity of the ore pulp that staying in the cyclone is short and small. Therefore, it’s easy to operate when it stops working.
Working principle Of Ore Dressing Equipment
External swirl and internal swirl: After the pulp enters the cyclone along the tangential direction through the feed pipe, it rotates from top to bottom under the limitation of the cylinder wall, forming an external swirl. The solid particles in the external swirling flow move towards the vessel wall under the action of centrifugal force. The particles that reach the vicinity of the wall move downward along the wall and are discharged at the bottom outlet. The separated and purified liquid continues to rotate downward. After entering the conical section, its speed increases due to the reduction of the inner diameter. As the radial pressure distribution is uneven, a low-pressure area or even a vacuum area is formed at the axis. The liquid tends to move towards the axis direction. At the same time, due to the reduction of the underflow outlet, part of the liquid is discharged from the overflow outlet, forming an upward internal swirling flow.
Other flow patterns: There are also short-circuit flow, circulating flow and other flow patterns. Short-circuit flow refers to the two-phase fluid fed into the hydrocyclone. One part first rises, then moves inward along the lower surface of the top cover, and then moves downward along the outer wall of the vortex overflow pipe. Finally, it converges with the inner vortex and is discharged from the overflow port of the overflow pipe. Without the separation effect, it directly affects the separation effect. The circulating flow is a two-phase fluid that migrates from the external swirling flow to the internal swirling flow in the form of a spiral vortex. As the overflow port of the overflow pipe cannot fully discharge it in time, it circulates in the space between the vortex overflow pipe of the cyclone and the wall of the cyclone.
Features Of Ore Dressing Equipment
Technical parameters Of Ore Dressing Equipment
Standard |
Inner diameter (mm) |
Feeding caliber (mm) |
Overflow pipe diameter (mm) |
Sand setting caliber (mm) |
Cone angle (.) |
Maximum feeding granularity (mm) |
Feeding pressure (Mpa) |
Processing capacity (m3/h) |
Separation size (μm) |
Unit weight kg |
|
LKH-660 | 660 | 187,167 | 180,200, 220,240 |
80,110,150 | 20 | 16 | 0.03-0.4 | 250-360 | 74-220 | 950 | |
LKH--500 | 500 | 130,120 | 130,140,160, 180,220 |
35,45,50,65, 70,80,90,100 |
25 | 10 | 0.03-0.4 | 140-220 | 74-200 | 416 | |
20 | 140-220 | 74-200 | 490 | ||||||||
10 | 74-150 | 556 | |||||||||
LKH--350 | 350 | 80 | 80,90,105, 115,120 |
30,35,40,45, 50,60,70 |
25 | 6 | 0.03-0.4 | 60-105 | 50-150 | 135 | |
20 | 0.03-0.4 | 50-150 | 155 | ||||||||
15 | 0.03-0.4 | 50-120 | 230 | ||||||||
LKH--300 | 300 | 64,75 | 65,80, 100,120 |
20,25,30, 35,40 |
20 | 5 | 0.03-0.4 | 45-90 | 50-150 | 88 | |
15 | 0.03-0.4 | 40-100 | 169 | ||||||||
LKH--250 | 250 | 55,74,80 | 60,75,80, 100,120 |
16,18,20,25, 30,35,40 |
20 | 3 | 0.05-0.4 | 40-65 | 40-100 | 63 | |
15 | 40-100 | 120 | |||||||||
10 | 30-100 | 123 | |||||||||
LKH--200 | 200 | 48 | 40,50, 55,65 |
16,20,24, 28,32 |
20 | 2 | 0.05-0.4 | 25-40 | 40-100 | 36 | |
15 | 30-100 | 64 | |||||||||
LKH--150 | 150 | 36 | 30,35, 40,45 |
8,10,12,14, 16,18,20,22 |
20 | 1.5 | 0.05-0.4 | 11-20 | 30-74 | 22 | |
15 | 30-74 | 20 | |||||||||
8 | 20-74 | 60 | |||||||||
LKH125 | 125 | 26 | 25,30, 35,40 |
8,10,12, 14,16,18 |
17 | 1 | 0.05-0.4 | 8-15 | 20-100 | 10 | |
8 | 20-74 | 12 | |||||||||
LKH--100 | 100 | 23 | 20,25, 30,40 |
8,10,12, 14,16,18 |
20 | 1 | 0.05-0.4 | 5-12 | 20-100 | 8 | |
15 | 10-100 | 5 | |||||||||
8 | 10-74 | 6 | |||||||||
LKH--75 | 75 | 13 | 15,17,20 | 6,7,8, 10,12 |
15 | 0.6 | 0.1-0.5 | 2-5 | 20-74 | 4 | |
7 | 0.1-0.5 | 5-40 | 7 | ||||||||
LKH--50 | 50 | 9 | 11,13, 15,18 |
3,6,8, 10,12 |
15 | 0.3 | 0.1-0.5 | 1.5-3 | 10-74 | 2 | |
6 | 5-30 | 2.5 | |||||||||
LKH--25 | 25 | 5 | 5,6, 7,8 |
2,3,4,5 | 5 | 0.2 | 0.1-0.5 | 0.3-0.1 | 3-10 | 0.8 | |
3 | 0.3-0.1 | 2-10 | 1.4 | ||||||||
LKH--10 | 10 | 2 | 2,3,4 | 12 | 4 | 0.1 | 0.1-0.1 |
Product Display Of Ore Dressing Equipment
Q&A
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time?
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms?
A: Accept payment type: T/T, L/C, Western union,Cash.
30% deposit when signed contract. Full payment paid before shipping
Contact Person: Mr. David
Tel: 86-18637916126